Vision

The Pembroke area is located immediately south west of the Town Core and is a substantial area of underutilised and/or vacant land with pockets of residential on the edge of the River Barrow. The vision for this area as an Intervention is to reimagine it as a new and vibrant residential quarter that benefits from its position on the banks of the River Barrow, new public spaces and enhanced connections with the Town Centre. This Intervention is central to realising one of the key aims of this Strategy, the promotion and delivery of Town Centre living.

Under the Intervention the area will be transformed to facilitate a range of residential types and densities, attractive to both residents and visitors due to a new public riverfront park, enhancements to the public realm, public riverfront connections and improved connectivity through the provision of two new bridges across the River Burrin. These bridges will provide direct access for both vehicles and pedestrians to Carlow Castle, which is also subject of an Intervention, with the pedestrian bridge continuing the pedestrian link along the River Barrow which can be expanded in the future as part of the Barrow Track.

Health & Wellbeing Principles

  • Provides access to urban green space for residents;
  • Promotes walking and cycling modes for use by tourists and visitors;
  • Increased opportunity for physical activity;
  • Access to the River Barrow as a leisure and recreational outlet; and
  • Contributes to a positive outlook and good mental health.

Layout plan  

“Cities have the capability of providing something for everybody, only because, and only when, they are created by everybody” - Jane Jacobs

A new residential district in the Town Centre that integrates with the existing urban fabric, improves the built environment and enhances access to amenities will be a transformational project in terms of achieving a core aim of this Strategy, delivering Town Centre living. The project will not only regenerate a substantial area of largely underutilised land but it will put people back in the Town Centre, help stabilise and grow the local economy and will breathe new life into the existing community. The reuse of these lands will also unlock the River Barrow as an amenity asset for both residents of and visitors to the area, including Carlow Castle to the north.

Living in the Town Centre was once a common feature of Irish Towns with people living close to where they worked, where children went to school and where they socialised. Walking and cycling were the main forms of transport with limited need to travel by car on a daily basis, while the critical mass of the resident population keep local retailers and services providers viable. However, as the population grew and housing demand increased, the development of new housing focused on suburban locations where land was readily available, easily accessible and restrictions to development were limited. The loss of Town Centre living had a severe negative impact on the vitality and viability of many Irish Towns resulting in business closures, vacancy, dereliction and streets dominated by cars.

As we become more climate aware, environmentally conscious and move towards a more sustainable way of living there is a renewed focus on Town Centre living. Urban residential schemes typically rely less on cars as the primary mode of transport due to their location relative to employment areas, services and amenities. In a postCovid 19 world, Town Centre living enables people to continue to live their lives, meeting their daily needs, while adhering to the advice to ‘stay local’. Along with the other Interventions outlined in this Strategy, the delivery of the Pembroke District Intervention will support the overall strategy of regeneration in Carlow Town and promote healthy, innovative, culturally rich and socially connected community activity.

Sustainability Principles

  • Prioritising walking, cycling and public transport use;
  • Improving public transport connectivity for Carlow both locally and regionally;
  • Creating a vibrant Town Centre through the delivery of an enhanced public realm with improved accessibility for sustainable transport modes;
  • Improving connectivity between the Town Centre and natural assets such as the River Barrow and River Burrin;
  • Facilitating appropriate and well designed access to natural spaces, features and landscapes;
  • Promoting the delivery of energy efficient buildings, sustainable energy measures for the public realm and encouraging innovative solutions from the private sector; and
  • Supporting compact urban growth by building on existing assets and capacity to create critical mass and scale for regional growth.

Residential Use at Pembroke District 

Riverside Public Realm at Pembroke District 

Key Projects

  • Project Linkages
    • Key Development Interventions
      • Low and medium density residential developments
      • Riverfront park space for public use
    • Key Linkage Interventions
      • New pedestrian bridge linking north on River Barrow
      • New vehicular bridge linking to Carlow Castle area
  • Key Features
    • New residential area near the Town Centre
    • Well-connected area for residential expansion
    • Opening up of the River Barrow
    • Greater utilisation of land
  • Key Physical Changes
    • Introduction of landscaping and planting programme
    • Tangible connection to the Civic Spine and the River Barrow
    • Part of the public riverfront connection throughout the Town

Key Design Moves

  • Creation of a new pedestrian bridge to create a link northwards along the River Barrow and to Carlow Castle.
  • New vehicular bridge connection from the Pembroke District to the Town Centre.

Outcomes

The interventions outlined above should deliver the following;

  • A medium to low density residential scheme in the Town which will contribute to the vibrancy of the Town Centre
  • The regeneration of an underutilised area of land with a mix of residential and recreational uses
  • Improved connectivity in a north-south direction to Carlow Castle and waterfront developments

Carlow Town is the County’s largest urban centre, with the portion of the population in County Carlow alone, i.e. excluding Graiguecullen, accounting for over one-third (35.1%) of the County’s population. Including Graiguecullen as part of the Town’s urban footprint brings the total population of the Town to 24,272, making it the thirteenth largest urban area in the State. With regard to the Town itself, between the 2011 and 2016 Census Graiguecullen and the Carlow Urban ED both experienced a population increase, a positive step in beginning to reverse population decline in the Town Centre.

Project Summary

The delivery of the overall scheme of projects presented as part of this Intervention will require a collaborative approach by both public and private parties. While this Intervention provides an indication of how this strategic Town Centre sites could be developed to deliver a new urban quarter rich with amenity spaces, the delivery of a residential scheme in this area is open to interpretation as detailed design progresses through consultation and partnership with the Local Authority.

An Exemplar

While the main outcome of the delivery of this Intervention will be the creation of a new residential district in the Town Centre, the final layout and detailed design of this will be subject to consultation with the Local Authority and therefore, an exemplar for comparable costs on the residential element is not viable.

A key feature of this Intervention to be delivered, notwithstanding the finalised design of the overall residential element, is the new pedestrian bridge. This bridge will provide a direct pedestrian link north toward the Castle and Town Centre as well as maintain a public River front path along the Barrow.

To provide a benchmark for the capital costs for such a bridge the ‘Living Bridge’ within the University of Limerick campus was reviewed as an exemplar. While the receiving physical environment and detailed design are unique to that project, it is similar in terms of the range of works. In addition, the ‘Living Bridge’ brings an additional element than just functionality, taking its design from the organic form of the River, it can accommodate a range of social, cultural and educational activities. This is a concept which should be considered in the design of the Pembroke pedestrian bridge given its riverside location, its integration in the wider Barrow track and its proximity to Carlow Castle. Completed in 2007, the ‘Living Bridge’ has a 350m span across the River Shannon, making it the longest pedestrian bridge in Ireland, and cost €12 million. It was financed through a public-private partnership.

Phasing & Costs

Pembroke District
  • This area is largely a private development site. The final layout and design of the public real internal to the site will be the subject to development by the landowners and funded by same.
  • Any potential public private partnership will detail the proportionality of costs in relation to the public realm.
  • In relation to the bridge crossings the following estimates cane be provided; pedestrian bridge €1.5 - €2 million subject to design and approximately €10 million of the vehicular bridge
  • The main public proposals include the two new bridges with the delivery of same subject to availability of funding from different sources.